Search Frequent Questions
Filter By:
-
Asbestos
Total results: 125
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 91
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 20
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 7
-
Lead
Total results: 397
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 236
- Testing for Lead Total results: 19
- Air Emissions Inventories Total results: 33
- Coronavirus (COVID-19) Total results: 93
- East Palestine, Ohio Train Derailment Total results: 108
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 45
- MOVES Total results: 51
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 63
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 118
- RadNet Total results: 33
- Risk Management Program (RMP) Total results: 284
Displaying 466 - 480 of 522 results
-
Does a local education agency (LEA) with all asbestos-free schools need a designated person pursuant to 40 CFR part 763.84(g)?
Yes. One of the requirements of the LEA is to continue the annual notification to parents and others of the availability of the management plan indefinitely. The designated person can handle any questions and concerns that arise regarding asbestos. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School…
- Last published:
-
Does cutting hatchways into ceilings where small amounts of asbestos is disturbed for purposes of mounting fire alarm components in a school fall within the scope of small-scale, short-duration activities under the Asbestos Model Accreditation Plan?
Yes, if the activity is required in the performance of an emergency or routine maintenance activity not intended solely as an asbestos abatement. Additionally, such work must be done and contained in a single prefabricated mini-enclosure (Appendix C to 40 CFR part 763, subpart E). Other Frequent Questions about Asbestos…
- Last published:
-
Does the Asbestos Hazard Emergency Response Act (AHERA) apply to schools on military bases?
Yes. AHERA applies to all public and private non-profit elementary and secondary schools, which includes schools on military bases. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated…
- Last published:
-
During an inspection, can a local education agency (LEA) just assume that some or all homogeneous areas of friable and nonfriable suspected ACBM are ACM rather than take samples?
Yes. 40 CFR part 763.85(a)(4)(iv) explicitly permits homogeneous areas of friable and non-friable suspected asbestos-containing building material (ACBM) to be assumed to be asbestos-containing material (ACM). (See also 40 CFR part 763.86(a), (b), (c), and (d)). Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for…
- Last published:
-
How can we have the air tested in my school?
The Asbestos Hazard Emergency Response Act (AHERA) only requires air testing following an asbestos response action (e.g., asbestos repair or removal activity) to determine whether the activity has been properly completed. This is done by measuring the amount of asbestos in the air where the asbestos response action took place…
- Last published:
-
How should the periodic surveillance results be documented pursuant to the Asbestos Hazard Emergency Response Act (AHERA)? How detailed does the information have to be and what constitutes adequate records?
40 CFR part 763.94(d) of the asbestos in schools rule pursuant to the Asbestos Hazard Emergency Response Act (AHERA) requires local education agencies (LEAs) to “record the name of each person performing the [periodic] surveillance, the date of the surveillance, and any changes in the conditions of the materials.” A…
- Last published:
-
How soon must a local education agency (LEA) inspect a school leased or acquired after October 12, 1988 that is to be used as a school building?
An LEA must inspect such a building anytime prior to its use as a school building. In the event that emergency use of an uninspected school building is necessitated such buildings shall be inspected 30 days after commencement of such use. (40 CFR part 763.85(a)(2)) Other Frequent Questions about Asbestos…
- Last published:
-
If a non-friable component such as a piece of floor tile is broken into small pieces in a removal process and the resulting pieces still can't be reduced to powder by hand pressure, does EPA require accredited workers?
If floor tiling is removed by a method that does not render it friable (not able, when dry, to be crumbled, pulverized, or reduced to powder by hand pressure) then removal is not considered to be a response action that requires workers accredited under the Asbestos Model Accreditation Plan (MAP)…
- Last published:
-
If the architect or project engineer responsible for the construction of the building provides a statement indicating there is no asbestos-containing material in the school, does the local education agency (LEA) have to submit an asbestos management plan?
40 CFR part 763.99(a) of the asbestos in schools rule provides that an LEA “shall not be required to perform an inspection under §763.85(a) in any sampling area . . . or homogeneous area of a school building where: . . . (7) An architect or project engineer responsible for…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), does the recommendation that the management planner provides to the local education agency (LEA) need to include a date for implementation of the response action?
No. However, the management plan must include a schedule for completing the response actions. (40 CFR part 763.93(e)(6)) Accordingly, the dates of implementation can be discussed between the management planner and the LEA. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), how does one determine the amount of air to sample for the phase contrast microscopy (PCM) analysis to maintain a limit of quantification of 0.01 f/cm3?
Follow the procedure in the Environmental Protection Agency (EPA) Silver Book, or “Measuring Airborne Asbestos Following an Abatement Action (EPA-600/4-85-049)” specifically outlined in Chapter 4, page 5. The volume required to reliably quantify fibers down to 0.01 f/cm3 may be calculated using the first formula on this page. Note that…
- Last published:
-
Will areas of newly friable asbestos-containing building material (ACBM) or newly friable assumed ACBM be required to undergo initial cleaning in accordance with 40 CFR part 763.91?
Yes, the following requirements as stated in 40 CFR part 763.91(c)(1) of the asbestos in schools rule will apply: “Initial Cleaning. Unless the building has been cleaned using equivalent methods within the previous 6 months, all areas of a school building where friable ACBM, damaged or significantly damaged thermal system…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), can someone collect more than five samples inside the asbestos abatement site and pick the best of the results for the clearance test?
No. An equal number of samples must be taken inside and outside the asbestos abatement site for clearance. The minimum number is five inside and five outside (40 CFR part 763.90(i)(3)). The asbestos-containing materials in schools rule does not prohibit the collection of more than five samples inside and an…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), must a local education agency's (LEA's) Designated Person be an employee of the LEA, or can this person be an outside consultant, available on a part-time basis?
The Designated Person does not have to be an LEA employee. The designated person can be an outside consultant and does not have to be on-site at the LEA. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain…
- Last published:
-
Who is responsible for overseeing the asbestos-in-schools regulations?
EPA is the primary governmental agency responsible for enforcing the regulations promulgated under AHERA. However, if your State has been issued a "waiver" (or delegation of program authority), the State agency then becomes responsible for enforcing these requirements. The states that currently have waiver programs are: Connecticut, Colorado, Louisiana, Massachusetts…
- Last published: